CASE STUDY

CASE STUDY:

Methane Consulting - Twin Cities Police Headquarters Larkspur, CA

The Challenge:

A passive methane mitigation system had already been designed for a complex slab-on-grade building supported by piles. The architect requested a peer review—smart move, because pile-supported slabs + methane systems = coordination headaches.

The risk:

  • Inefficient installation
  • Excess material usage
  • Trade coordination conflicts
  • Higher overall project cost

The solution:

Terra-Petra conducted a peer review of the methane mitigation design.

  • Validated core system components to ensure no unnecessary redesign elements
  • Identified inefficiencies in vent piping + membrane termination due to the pile foundation system
  • Redesigned horizontal vent routing + membrane detailing for constructibility
  • Collaborated directly with the design engineer

The outcome:

  • ~20% reduction in vent piping and membrane materials
  • Fewer contractor mobilizations
  • Simplified coordinationacross trades
  • Lower overall installation cost
  • Project delivered and operational (opened January 2012)

the takeaway:

Good methane design isn’t just about compliance—it’s about constructibility and cost control.

Most firms stop at “it works.”  Terra-Petra drives to “it works efficiently in the real world.”

Project Details

12,500 SF
Slab-on-Grade on Piles

service provided

Methane Consulting

Location

Twin Cities Police Headquarters
Larkspur, CA

Download
PRINT VERSION

Download a printable pdf copy of this case study to reference offline when discussing your own development project